The Evolution of Commercial EV Charging: Infrastructure Planning for Illinois Businesses
The Evolution of Commercial EV Charging: Infrastructure Planning for Illinois Businesses
The "EV Revolution" is no longer a future prediction; it is an current reality on Illinois roads. Driven by the aggressive electrification goals of the Climate and Equitable Jobs Act (CEJA) and the federal "National Electric Vehicle Infrastructure" (NEVI) program, Illinois is rapidly building out one of the most robust charging networks in the country.
For Illinois businesses, providing EV charging is moving from an "amenity" to a "necessity." Whether you are a commercial landlord looking to attract top-tier tenants, a retailer wanting to increase "dwell time," or an employer seeking to provide workplace benefits, EV charging is a strategic investment. This guide explores the evolution of commercial EV charging in Illinois and how to plan the infrastructure for your facility.
Illinois' EV Boom: Is Your Business Missing Out on the Charging Revolution?
Illinois has set a goal of having 1 million electric vehicles on its roads by 2030. To support this, the state is investing hundreds of millions of dollars in charging infrastructure.
The New Tenant Requirement
For commercial real estate owners in Chicago and the suburbs, EV charging is becoming as fundamental as high-speed internet. Major corporate tenants are setting "Sustainable Travel" goals and are increasingly refusing to lease space in buildings that do not offer workplace charging for their employees.
The Retail "Dwell Time" Advantage
For retail businesses, EV chargers are more than just a service; they are a marketing tool. An EV driver will choose a grocery store or shopping center with charging over one without it. Because Level 2 charging takes 1-2 hours for a meaningful top-up, these customers stay longer and spend more than the average shopper.
Fleet Electrification
If your business operates delivery vans or service vehicles, the transition to an EV fleet can slash your fuel and maintenance costs. However, it requires significant "behind-the-meter" infrastructure planning. To see how this impacts your utility bill, read our guide on the impact of EV fleets on commercial energy bills in Illinois.
Level 2 vs. DC Fast Charging: Choosing the Right Power Play for Your Commercial Property
Not all chargers are created equal. Choosing the right "Level" of charging is the most important decision in your infrastructure plan.
Level 2 Charging: The Workplace Standard
Level 2 chargers are the most common for commercial properties.
- Power: 7kW to 19kW (240V AC).
- Speed: Adds 25-35 miles of range per hour.
- Best Use: Office buildings, multi-family housing, hotels, and employee parking lots.
- Cost Advantage: Much lower hardware and installation costs than DC Fast Charging. Most existing Illinois commercial electrical panels can accommodate several Level 2 chargers with minimal upgrades.
DC Fast Charging (DCFC): The Rapid Response
DC Fast Chargers are high-powered units that bypass the vehicle's onboard charger to deliver power directly to the battery.
- Power: 50kW to 350kW+ (480V 3-Phase DC).
- Speed: Adds 100-250 miles of range in 20-30 minutes.
- Best Use: Retail centers, highway-adjacent properties, and fleet depots with high-utilization vehicles.
- Consideration: Requires significant electrical infrastructure, often including a new utility transformer and service upgrade.
Funding Your Future: A Complete Breakdown of Illinois EV Charging Grants and Business Incentives
The "first cost" of EV charging is being significantly offset by state and federal programs.
1. IEPA "Driving a Cleaner Illinois" Grants
The Illinois EPA regularly releases funding rounds for EV charging. These grants can cover up to 80% of the total project cost for both Level 2 and DC Fast Charging. Projects located in "Equity Investment Eligible Communities" (as defined by CEJA) often receive even higher priority and funding levels.
2. Utility "Make Ready" Rebates (ComEd and Ameren)
Both ComEd and Ameren Illinois have launched massive "Make Ready" programs. These programs pay for the expensive part of the installation: the trenching, wiring, and electrical panel upgrades required to support the chargers. In many cases, the utility will cover 100% of these "infrastructure" costs, leaving the business to pay only for the charging hardware itself.
3. Federal 30C Tax Credit
The federal government provides a tax credit (the 30C Alternative Fuel Infrastructure Tax Credit) of up to 30% of the cost of the hardware and installation, capped at $100,000 per location. Note that for commercial entities, this credit is now targeted at projects in "eligible census tracts" (low-income or non-urban areas).
Learn how to stack these with other funds in our guide to leveraging Illinois state tax incentives.
Your 5-Step Blueprint for a Seamless Commercial EV Charger Installation in Illinois
A successful installation requires coordination between your facility team, your electrical contractor, and the utility.
Step 1: Site Assessment and Load Study
Before buying hardware, have an electrician perform a load study. They will determine how much "spare capacity" your current electrical panel has. This will dictate how many chargers you can install without a costly service upgrade.
Step 2: Choose Your Hardware and Software (Networked vs. Non-Networked)
For a business, "Networked" chargers are essential. They connect to the internet (via Wi-Fi or Cellular) and allow you to:
- Set Pricing: Charge tenants or the public for usage.
- Manage Loads: Ensure that multiple chargers don't trip your building's main breaker.
- Track Data: Generate reports for your carbon emissions reporting.
Step 3: Utility Interconnection Request
Submit an interconnection request to ComEd or Ameren early in the process. They will verify if the local grid can handle the new load and if a new transformer is needed.
Step 4: Installation and Permitting
Ensure your contractor is familiar with local Illinois building codes and ADA (Americans with Disabilities Act) requirements for EV spaces. You must ensure that at least one of your charging spaces is accessible to people with disabilities.
Step 5: Activate and Market Your Stations
Once installed, list your stations on platforms like PlugShare and ChargePoint. This will put your Illinois business "on the map" for the thousands of EV drivers searching for their next charge.
For a look at the legal side, see legal considerations for property owners offering EV charging to tenants in Illinois.
Conclusion
The evolution of commercial EV charging in Illinois is a transformative opportunity for businesses. By planning your infrastructure today, you can future-proof your property, attract high-value tenants and customers, and take advantage of the most aggressive incentive programs in the state's history. EV charging is no longer about "being green"—it's about being competitive in the new Illinois economy. The chargers you install today are the gas stations of tomorrow.
Sources:
Frequently Asked Questions
QWhat is the difference between Level 2 and DC Fast Charging?
Level 2 charging uses 240V AC power and adds about 20-30 miles of range per hour, making it ideal for workplaces and hotels where cars are parked for several hours. DC Fast Charging (Level 3) uses high-voltage DC power and can charge an EV to 80% in 20-40 minutes, making it best for retail locations or highway stops.
QAre there grants for EV charging in Illinois?
Yes. The Illinois Environmental Protection Agency (IEPA) offers significant grants through the Driving a Cleaner Illinois program. Additionally, utilities like ComEd and Ameren offer 'Make Ready' rebates that can cover up to 100% of the electrical infrastructure costs required to install chargers.
QHow much does it cost to install commercial EV chargers in Illinois?
A single-port Level 2 charger typically costs $2,000 - $5,000 for the hardware and another $2,000 - $10,000 for installation, depending on the distance from your electrical panel. DC Fast Chargers are significantly more expensive, often exceeding $50,000 per port for hardware and installation.